Methodology

Primary sources, one link per number, a date on every row.

Where the data comes from

Rank and revenue come from ENR’s Top 400 Contractors tables in the May 25, 2026 issue: the overall rank, the 2025 revenue, the share of revenue by market sector and the share delivered as construction manager at risk, plus ENR’s Top 20 in the telecommunications sector, which is where ENR counts data centers. Delivery models, self-performed trades, megawatt claims and named clients come from each contractor’s own website, project pages and press releases. Every record lists its sources with the date we accessed them, and every number in the table links to the source it came from.

Who is on the list

A firm is listed when it leads data center construction as general contractor, construction manager, design-builder or EPC contractor, and at least three facts about it can be sourced. Electrical contractors such as Rosendin and M.C. Dean, which publish data center work as a trade partner rather than as prime, are left out, as is MasTec, whose ENR telecom revenue is mainly fiber and wireless. Builders ranked by megawatts delivered and their reference projects are covered by the sister directory datacenterconstructioncompanies.com.

How we verify

Each row shows the date we last checked it. A field stays empty when it was not verified in the sources reviewed. Megawatt claims keep their basis (delivered, delivered or underway, annual, pipeline), so two MW figures are only comparable when their bases match. Reference project capacity and status are separate fields. An award or groundbreaking announcement does not establish completion. ENR ranks firms reporting US and international construction revenue; a blank rank means the cited table does not establish one for that record.

Delivery models and self-perform capabilities can describe a whole company, regional division or named subsidiary. They are not proof that every listed trade is self-performed on every data center. The scope qualifiers stay with the value. We do not infer CM at risk from ordinary construction management, design-build from design support, or own-crew installation from a managed subcontract scope. Contractor type and market regions normalize the roles and locations described in the cited sources.

Second-pass exclusions

ISG’s UK construction companies are excluded: EY’s administrators state that they entered administration on 20 September 2024 and ceased trading (accessed 11 November 2026). Kirby’s data centre page establishes specialist mechanical, electrical and high-voltage work, but not a whole-campus prime contract. Arcadis describes design and project management for KBC’s data centers; that role is outside this directory’s construction-prime scope.

Corrections

Vendors and readers can send corrections to hello@datacentergeneralcontractors.com with a public source. We update the row and its verified date. Featured placement is paid and labelled; it never changes a row’s data or its position in the sorted table.

Reuse

The dataset is free to reuse under CC BY 4.0 with a link to datacentergeneralcontractors.com. Download it as CSV or JSON.

Field definitions

29 fields
Contractor type
What the firm is when it leads a data center job: a general contractor or construction manager, an engineer-constructor that designs and builds under one EPC contract, a design-build specialist focused on advanced-technology facilities, or an electrical contractor that holds the prime contract.
ENR telecom rank #
Rank on ENR's 2026 Top 20 Contractors by Sector: Telecommunications, ranked by 2025 revenue. ENR's telecom sector covers data centers, cabling and towers, and ENR credits the data center buildout for the sector's 86.4% growth in 2025.
Telecom/DC revenue 2025 $M
2025 telecommunications-sector revenue in US$ millions as ENR published it in the 2026 Top 20 by Sector table (data centers sit in this sector).
Top 400 rank #
Overall rank on ENR's 2026 Top 400 Contractors list (May 25, 2026 issue), ranked by 2025 US and international construction revenue.
Top 400 rank (2025 list) #
The firm's rank on the 2025 Top 400 list, as printed beside its 2026 rank. A drop in the number is a climb up the list.
Telecom/DC share %
Share of the firm's 2025 Top 400 revenue that came from ENR's telecommunications sector (data centers, cabling, towers), as printed in the Top 400 table.
CM-at-risk share %
Share of the firm's 2025 revenue delivered as construction manager at risk, as printed in the ENR Top 400 table.
Total revenue $M
Company-wide annual revenue in US$ millions for the year in Revenue year, from the company, its filings or ENR. Non-USD figures are converted at the rate stated in Revenue note.
Revenue year
Year (or fiscal year) the total revenue covers.
Revenue note
Basis of the total revenue: which entity, fiscal year end, and any currency conversion.
Delivery models
Published contracting methods or delivery services. A named project supports that project’s model; company service pages describe broader capabilities. CM-at-risk shares from ENR are company-wide, not data-center-only.
Design-build
Offers design-build or EPC delivery (one contract for design and construction), per the firm's own pages.
CM at risk
Offers construction management at risk (guaranteed maximum price), per the firm's own pages.
Self-perform trades
Own-crew or in-house subsidiary capabilities stated by the firm. Company-wide capabilities are not proof they were used on every data center. Unspecified trades remain explicitly unspecified; scope and subsidiary qualifiers are preserved.
Self-performs electrical
Performs electrical work with its own crews or an in-house electrical subsidiary, per the firm's own pages.
Markets
Regions where the firm builds data centers, from its own office list or project pages: North America, Latin America, Europe, Middle East, APAC.
Data center track record
The firm's own headline data center claim with its basis kept intact: MW delivered, projects completed or square feet built, and whether it is cumulative, annual or delivered-or-underway.
MW claimed MW
The megawatt number in Data center track record, for sorting. Bases differ (delivered, annual, underway); read it with the track record text.
Named data center clients
Data center owners, operators or tenants the firm or its client has publicly named on a project. Confidential clients are never inferred.
Ownership
Who owns the firm: its employees (ESOP or employee shareholders), a family or private holders, public shareholders, or a listed parent group.
Employees
Headcount as the firm or its parent reports it (whole company, not data center staff).
Headquarters
Head office city and country as the firm states it.
Reference project
Named data center project. Kept separate from company-wide portfolio claims.
Reference capacity and basis
Published capacity of the reference project, preserving planned, ultimate and phase qualifiers. Not a delivered portfolio total.
Reference project status
Status stated by the cited project source; an announcement does not establish completion.
Reference completion
Published project completion date or forecast, preserving the source’s qualifier.
Reference project area
Area of the reference project in square metres, as stated by the source.
Reference delivery scope
Construction responsibilities described by the project or capability source. Delivery scope does not by itself establish a design-build contract.
Corporate status
Published corporate name or structure change, with announcement and effective dates kept distinct.